亚洲国产精品精华液网站_韩国公和熄三级在线观看_永久免费福利超清影视站_黄叶网男人的DV天堂_久久精品国产亚洲āV麻豆网站_欧美多人群p刺激交视频_黄片在线免费观看欧美_一级特黄AAA毛片_亚洲午夜中文日韩_欧美日韩一区电影在线观看

咨詢服務(wù) 培訓(xùn)服務(wù)
  肯達(dá)信服務(wù)熱線 CTS 統(tǒng)一客服電話
400-690-0031
 
 
首頁(yè)>咨詢服務(wù)>COCA-COLA驗(yàn)廠咨詢
COCA-COLA驗(yàn)廠咨詢----可口可樂(lè)供應(yīng)商指導(dǎo)原則(十四)呈報(bào)規(guī)定


Reporting Requirements



Assessment and Assessment Summary Report

These are the standard reports issued for an initial or full assessment report. It implies an assessment against all SGP elements.


Follow-Up Assessment and Follow-Up Assessment Summary Report

These are the reports issued for an assessment geared to verify correction of previously found violations. It is not a full SGP assessment, and can only be done within 6 months of the previous audit. If not completed by this timeframe, a full re-assessment is required. A Follow-Up Assessment Summary Report only includes findings.


Assessment Summary Report Update

This report is only issued in those rare instances where verification of corrective action can be done by the service provider with pictures or documentation, in lieu of a Follow- Up Assessment. However, if a Follow- Up assessment is required to address other issues in the assessment report, the evidence should instead be verified during the Follow- Up Assessment process.


Assessment Ratings & Required Next Steps

The assessment rating, along with the facilities corrective action plan and implementation thereof, determines the appropriate next steps and their timing. Any deviation from TCCC defined timing for Follow Up Assessments and/or Re- Assessments must be approved by WA. A summary of assessment ratings is below.


RatingDefinitionScoreNext Steps
GreenIn compliance0Re-assess in 1-3 years, depending on risk
YellowMinor noncompliance1-7

Compliance can be demonstratedthrough documentation or photos that confirm correction typically within 3 months of the assessment date. Re-assessment in 3 years, depending on risk.


OrangeModerate noncompliance8-27Most Orange facilities requirea follow-up assessment, typically within 6 months.

In rare instances where a WAM waives that requirement, compliance can be demonstrated through documentation or photos that confirm correction typically within 3 months of the assessment date.


RedSignificent noncompliance28+

Facility Action Plan within 30days from assessment  date,  corrective  action implemented, Follow-Up  Assessment typically within 6 months










客服中心
楊老師
王老師
徐老師
郭小姐
張小姐
陳老師
您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

楊老師

您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

王老師

您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

徐老師

您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

郭小姐

您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

張小姐

您好,我是肯達(dá)信管理顧問(wèn)公司客服,歡迎咨詢!

陳小姐


客戶服務(wù)熱線

400-690-0031

24小時(shí)熱線

18576401396


展開客服