祝賀 中山市小欖鎮(zhèn)*玫瑰制衣有限公司 5月通過 RCS認(rèn)證
公司名稱:中山市小欖鎮(zhèn)*玫瑰制衣有限公司
驗(yàn)廠項(xiàng)目:RCS認(rèn)證
咨詢公司:深圳市肯達(dá)信企業(yè)管理顧問有限公司
通過審核公司介紹:
中山市小欖鎮(zhèn)*玫瑰制衣有限公司經(jīng)營范圍:生產(chǎn)、來料加工、銷售:內(nèi)衣、內(nèi)褲(不含洗水、印染)。
熱烈祝賀 中山市小欖鎮(zhèn)*玫瑰制衣有限公司,在經(jīng)過肯達(dá)信顧問的輔導(dǎo)后,于5月順利通過 RCS認(rèn)證
RCS認(rèn)證輔導(dǎo)---Recycled Claim Standard 2013(A3 Compliance Requirements – Production)
A3 Compliance Requirements – Production
A3.1 Application of Production Requirements
Organizations involved in production of RCS goods are subject to RCS certification. The TE Recycled ClaimStandard requires compliance with the requirements (sections A, B, C and D) of the Content Claim Standard,whereby the ‘Claimed Material’ is replaced with ‘Recycled Material’ as defined in section A1.2f.
A3.2 Production
In addition to the requirements of the CCS, all organizations involved in the production of RCS products must meet the following requirements:
A3.2a All recycled materials entering the supply chain must have a valid Transaction Certificate (TC) issued by an approved CB.
A3.2b The amounts of pre-consumer and post-consumer waste must be recorded separately at all steps of production.
A3.2c Traders with an annual turnover of less than $10,000 of RCS goods, and retailers selling to end consumers only, are exempt from the certification obligation; provided that they do not (re-) pack or (re-)label RCS Goods. Exempted traders with less than $10,000 annual turnover of RCS Goods must register with an Approved Certification Body and must inform the Certification Body immediately once their annual turnover exceeds $10,000, or once they plan to (re-)pack or (re-)label RCS goods.
A3.2d In cases where there is the possibility of differential rates of production loss between recycledand virgin inputs, organizations must address this through their mass balance formula.
A3.2e Buyers of the RCS product will be responsible to set any further requirements on the specificstandards or requirements to which the input material must be certified. These additionalrequirements are separate from the RCS and its certification process.