Raw Material, Packaging and Secondary Site Management Supplier and secondary site approval and management ensures that the site receives safe and legal materials of the desired quality from reputable suppliers.


Clause

Item

Detail

What good looks like
3.1 Base

Supplier Risk Assessment


All suppliers must be assessedto determine the overall

potential risk associated with heir materials.

The assessment must consider:

? Any known defects or potential problems

associated with the material and/or the supplier

? The volume and usage of the material

? Functionality of the material

The assessment is then used todetermine how the supplier is approved and monitored and thelevel of monitoring required on the rawmaterial

The assessment is in the form of a matrix.

New supplier + known defects + high volume used + contained within majority of products on site = High

Risk and therefore a site audit is required.

Existing supplier + no known defects

+ low volume = Low Risk and

therefore a supplier self audit report is required.

3.2 Base

Supplier Approval


Approval must include at least one of, or, a combination of:

A site audit

A valid 3 rd party certification Supplier self assessment questionnaire


A suitable 3 rd part certification would include the BRC Consumer Product Standard, IFS or IOP.


3.3 Base

Third Party Audits


If a supplier has been approved on the basis of 3 rd party

audit, the valid certificate, audit report and corrective

action summary must be available on site. The site must have reviewed this material.



3.4 Base

Audit Requirement


If the assessment requires an approval audit to be carried out, this must be completed prior to supply and must encompass the principles of this standard.

If a critical non-conformance or 4 major non-conformances are found, corrective action must be completed and verified before supply begins. If the site is an existing supplier and there is potential impact on

Tesco products in the supply chain, Tesco must be informed immediately. The audit report and details of the agreed corrective actions and timescales must be available on site, together with verification of completed corrective actions.


3.5 Base

Approved Supplier Database


Raw materials & packaging must be sourced only from approved suppliers. Supplier details, including the materials supplied must be held on an approved

supplier database.

e.g. factory systems only permit purchase orders to be raised for approved suppliers.


3.6 Base

Trained Auditors


Supplier audits, where required, must be completed by trained auditors with experience in the product area being assessed.

e.g. Internal auditor training or trained by an Internal Auditor.



<

客服中心
楊老師
王老師
徐老師
郭小姐
張小姐
陳老師
您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

楊老師

您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

王老師

您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

徐老師

您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

郭小姐

您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

張小姐

您好,我是肯達(dá)信管理顧問公司客服,歡迎咨詢!

陳小姐


客戶服務(wù)熱線

400-690-0031

24小時(shí)熱線

18576401396


展開客服